Specializing in commercial-sized environmental assessment and remediation projects on the Colorado Front Range

Site Remediation with Activated Carbon Compound

Direct-push drill rig drives injection pipe string to target depth of 12 ft, for the injection of the BOS-200 activated carbon/sulfate compound. The purpose is to enhance the bio-degradation of petroleum hydrocarbons.

This equipment mixes the BOS-200 materials into an aqueous solution, for pumping into the subsurface under high pressure.